Spring Sprouts Store [ ]
There are 3 variations of this store, which are accessed according to Level .
Introduction [ ]
The Spring Sprouts Store was introduced during the Spring Theme in March 2012 along with the Small Florist . It was re-introduced in the Spring Theme Recall in March 2013.
As a limited store, it became unavailable after the weekly theme concluded.
Recipes [ ]
Spring Sprouts Store for Level 5 [ ]
Time
Resource
Rewards
XP
Hurry Finish
Spring Seeds
4m 15s
20
36
220
1
Bean Sprouts
50m
35
103
685
1
Flower Buds
7h 10m
110
412
1,560
3
Spring Sprouts Store for Level 15 [ ]
Time
Resource
Rewards
XP
Hurry Finish
Spring Seeds
4m 15s
23
63
220
1
Bean Sprouts
50m
55
190
770
1
Flower Buds
7h 10m
142
505
1,720
3
Spring Sprouts Store for Level 24 [ ]
Time
Resource
Rewards
XP
Hurry Finish
Spring Seeds
4m 15s
42
108
575
1
Bean Sprouts
50m
83
295
1,470
1
Flower Buds
7h 10m
232
730
4,720
3
Economic Analysis [ ]
Introduction
The break-even point analysis is based upon Market Forecast data from October 1, 2012 to August 24, 2013. This period consists of 328 days. This number of days is used below to calculate the percentage days profit/loss. Please be aware that a profit is made on days where market prices are lower than breakeven and vice-versa.
Spring Sprouts Store for Level 5 [ ]
Spring Seeds
Bean Sprouts
Flower Buds
Breakeven Point
180 per 100
294 per 100
375 per 100
Reward
36
103
412
Estimated Cost
17
30
93
Estimated Profit/(Loss)
19
73
319
Days with Profit/(Loss)
/h
508
124
57
/h
3106
822
218
Profit/(Loss) /h
269
88
44
Spring Sprouts Store for Level 15 [ ]
Spring Seeds
Bean Sprouts
Flower Buds
Breakeven Point
274 per 100
345 per 100
356 per 100
Reward
63
190
505
Estimated Cost
20
47
121
Estimated Profit/(Loss)
43
143
384
Days with Profit/(Loss)
/h
889
228
70
/h
3106
924
240
Profit/(Loss) /h
614
172
54
Spring Sprouts Store for Level 24 [ ]
Spring Seeds
Bean Sprouts
Flower Buds
Breakeven Point
257 per 100
355 per 100
315 per 100
Reward
108
295
730
Estimated Cost
36
70
197
Estimated Profit/(Loss)
72
225
533
Days with Profit/(Loss)
/h
1525
354
102
/h
8118
1764
659
Profit/(Loss) /h
1021
269
74
Market Analysis
Average cost of resources from October 1, 2012 to August 24, 2013
85 / 100